Our highlightED projects
SCALE OF WORK: 1 x End Line
LOCATION: U.S.A
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 465 3D detailed drawings
LOCATION: United Kingdom
SCOPE OF WORK:
– Converting from 2D to 3D Design Works
SCALE OF WORK: 1 x Can Line (Line Upgrade)
LOCATION: Sri Lanka
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (Line Upgrade)
LOCATION: Myamar
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line, 1 x End Line
LOCATION: Brazil
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line
LOCATION: South Africa
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (Line Upgrade)
LOCATION: United Kingdom
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 344 3D detailed drawings
LOCATION: United Kingdom
SCOPE OF WORK:
– Converting from 2D to 3D Design Works
SCALE OF WORK: 1 x Can Line (2400 CPM)
LOCATION: Thailand
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (Upgrade existing Can Line)
LOCATION: South Korea
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (1800 CPM)
LOCATION: Viet Nam
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 2 x End Line (6000 EPM)
LOCATION: Kurdistan
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Aerosol Can Line (1200 CPM)
LOCATION: U.S.A
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 2 x Can Line (3000 – 6000 CPM), 2 x End Line (3000 – 6000 EPM)
LOCATION: Hungary
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (1800 CPM)
LOCATION: South Africa
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
LOCATION: Brazil
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: Can Line (1800 CPM)
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (1800 CPM), 1 x End Line (2100 EPM)
LOCATION: Sri Lanka
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x End Line (3000 EPM)
LOCATION: Viet Nam
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (1200 CPM)
LOCATION: Taiwan
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (2000 – 3000 CPM)
LOCATION: Russia
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: Can Line (Line Upgrade)
LOCATION: Saudi Arabia
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 2 x Can Line (3000 – 6000 CPM), 2 x End Line (3000 – 6000 EPM)
LOCATION: Germany
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (2200 CPM)
LOCATION: Thailand
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: Can Line, End Line
LOCATION: China
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (2000 CPM)
LOCATION: Viet Nam
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (2400 CPM)
LOCATION: Sirya
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (2400 CPM), 2 x End Line (9000 EPM)
LOCATION: Saudi Arabia
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
SCALE OF WORK: 1 x Can Line (1800 CPM), 1 x End Line (1800 EPM)
LOCATION: Viet Nam
SCOPE OF WORK:
– Designing foundation
– Designing platform
– Designing ducting system
– Designing water supply system
– Designing compressed air system
– Designing vacuum system
– Designing cooling water system
– Designing reverse osmosis (R.O) water system
– Designing Deionization (D.I) Water system
– Designing hot water system
– Designing waste water system
– Designing cooling oil system
– Designing GAS system
– Designing steam system
– Designing lighting system
– Designing electrical power distribution
